Milano (IT)

HCI – Hermes

  • Client: HCI - Hermes

Scroll
  • DATE: 2018
  • LOCATION: Busto Garolfo (MI), Italy

The HCI project outlines the reuse, adaptation and expansion of an existing industrial building to house the new production site of a shoe factory.

Solids has developed the project starting from the first concepts up to the executive phases including the work management and the bureaucratic procedures.

The project reflects three requirements of the customer: ensuring the best use of production spaces, creating a quality space for employees, and reinforcing the image of the existing building.

The main works carried out, concerned the reorganization of the layout of the machinery and the corresponding plants in the production area, the formation of the logistics area, and the realization of an extension to meet the need to group all the spaces for offices and ateliers in close relation to the production and at the same time facing the agricultural landscape.

Finally, the exterior of the existing building has been revised with the addition of a façade shielding in perforated metal panels containing references to the Brand logo.

  • AREA: 4.800 mq
  • PROJECT TEAM: Solids
  • DESIGN PHASE: 2017
  • CONSTRUCTION PHASE: 2018